
Around 550 soft drinks to Høgevarde – carried in over three jobs
Around 250 soft drinks on each of the first two deliveries and 50 on the last. We walked 4.5 km each way and spent about a day and a half per job.
Read the full post →Completed projects
Here are examples of jobs we have completed, with information about routes, loads and chosen solutions. Newest projects first.

Around 250 soft drinks on each of the first two deliveries and 50 on the last. We walked 4.5 km each way and spent about a day and a half per job.
Read the full post →
Two bunk beds with mattresses and kitchen supplies were transported to Spikertjernhytta. The deliveries took place on 17 August and 8 September, with about a 400 metre walk from the car park.
Read the full post →
Firewood was delivered to DNT Sinnerdammen alongside DNT volunteers.
Read the full post →
We delivered 10 sacks of firewood, 60 litres each, to Kiellandbu. Weather, snow conditions and terrain limited us to two sacks on each sled and one return trip per day.
Read the full post →
Provisions were carried from Hjølmø to the DNT cabin Hadlaskard on Hardangervidda.
Read the full post →
Old furniture was taken out and new furniture brought in by rowing boat and manual handling.
Read the full post →
Three batteries weighing 74 kg each and solar panels were transported 2.5 kilometres along a farm track and trail.
Read the full post →
Three pallets of building materials and a kitchen were transported by barge, boat and a final manual stage.
Read the full post →A small boat was transported from the DNT cabin back to a vehicle-accessible road.
Read the full post →